Tuesday, June 13, 2017

The Big Day :Panama Canal Transit

14th May 2017


P5263601The chirping of Liam’s iPad alarm at 3 am isn’t as a rule music to our ears, but today was different. It was transit day. And although we didn’t quite leap out of bed we did get a move on so we could still enjoy our morning ritual of having a cuppa in bed.


P5143213Every yacht that transits the canal is required to have four line handlers, an advisor and a helmsman. Our three extra line handlers were due to arrive at 0330. John and Frances are friends from an Aussie boat and they had line handled many times on other boats, and the other person was Eric, a professional line handler. Eric arrived bearing four coils of heavy duty rope, each 128ft in length as well as five big kickass fenders.There were supposed to be six fenders but one went missing along the way, Not to worry, we just added in one of ours to make up the numbers. Late afternoon  the previous day we had a call from our transit agent Roy Bravo of Emmanuel Agencies informing us that we’d be going through in one straight hop. You beauty!

Normally yachts  are scheduled to transit over a two day period starting at 6pm, with an overnight stop at the halfway point in Gatun Lake. When your boat is bursting at the seams with provisions and spare parts  ready to cross the Pacific, the two day hop makes for very cramped sleeping quarters as you have to provide beds for the extra bodies as well as feeding them all dinner, breakfast and lunch along with cold drinks and snacks. So we were very lucky getting the single day transit. We still had to provide breakfast and lunch as well as lots of cold bottled water, but it was no big deal. An added bonus was that we’d get to see the whole shooting match in daylight and the forecast was for a clear sunny day, unlike the previous few days that had been overcast with heavy rain.


P5143078So off we went. Under the cover of darkness we crept out of the marina and headed over to an anchorage named “The Flats” where we’d  pick up our advisor for the day. There were to be three yachts rafted (tied ) together in our little posse. GWTW, Consensus, a drop dead gorgeous Oyster 72 and a 55ft Danish boat named Gwendoline. Shortly after arriving at The Flats we realized that Gwendoline was a non starter. We heard later that they’d mistaken the time frame and thought the transit was a PM event and not an AM one. So that just left the Consensus and us. More room in the locks with only two of us, so that was a bonus.

Just after 5am our advisor Ahmed climbed aboard from the pilot boat and off we went. The rumor mill is ripe with stories of nasty, rude advisors who bark orders at the crew and tell skippers to keep up their maximum speed across the Gatun Lake, only to have to sit and wait for hours on the other side of the lake. Our man Ahmed was the complete opposite, he was charming and courteous and a pleasure to have aboard.


P5143075 P5143083

A funny thing happened on the way to the locks. Sadly, our advisor’s day did not start with a bang, it was more like a plonk. Just after he boarded GWTW Annie was preparing to serve the crew a hot breakfast as per instructed by our agent. Ahmed politely shimmied along the cockpit seat so John and Frances could sit down. He picked up his satchel full of personal gear and transit papers and moved it off the seat reaching behind him to place it on what he thought was a shelf. Then he took off his shoes, this time leaning over the back to put them with his satchel and it was then that he realized his mistake.There is no shelf  behind our cockpit seat, only fresh air and the dark waters of the ocean, He was pretty well speechless, softly saying my satchel , my satchel, I put it there, what was I thinking!. We turned the boat around in the hope that it was still floating, it was long gone. But the show had to go on, satchel or no satchel.


P5143130Breakfast went down a  real treat. Liam had precooked bbq snags the night before to save time so they would only needed reheating and Annie fresh cooked sunnyside-up eggs, roasted tomatoes and sautéed  asparagus with lemon and pepper. Strangely, both Eric and Ahmed started to chuckle while they were eating their sausages and even stranger they were eating them with their fingers and not the cutlery. It almost appeared that they were peeling them, oh well when in Rome. 

After the meal Ahmed quietly said, “Annie that breakfast was delicious but  just so you know, in Panama the sausages are wrapped in plastic that you need to remove before cooking” What the %*#%!  Neither Liam or I had noticed the very fine, invisible to the untrained eye, plastic casing on the snags. What a stuff up, no wonder  the snags had a strange smell, but no-one died so that’s a good thing. With the embarrassment of the snag-gate over, all six of us had a good laugh and the earlier satchel incident was also forgotten as the mood lightened. But it was time to get down to business and onward to the first lock we went.


P5143177Usually if there is a cat in the raft of three boats the cat is the steerage vessel as they have two engines giving them more maneuverability of the raft. As there was only GWTW and Consensus in our raft up we were out ranked by the Oyster’s dimensions and  by her having 200 horses to play with as well as a bow thruster. Essentially we just tagged along while her paid crew did all the grunt work and that was fine by us. The two boats would be joined at the hip for our trip up the first three locks to Gatun Lake and  then once again for the three lock ride back down to the Pacific Ocean.


DSCN0801It was just coming up to 7am by the time our raft of two entered the first lock, ahead of us was a cargo ship  named SEATRADE RED from Monrovia. We would get to look at her stern for the next few hours. With Consensus being the lead boat all we had to do was to keep our engines in idle in case they were needed while our three line handlers on our starboard side managed the lines.

As soon as we were trussed up like a turkey and secured  to the wall cleats high above us the massive lock doors began to close and the rushing waters around us began to rise taking us up with it. The line handlers have to be on their toes as a stuff up at this point, eg pulling them in or letting them out to slow, while going up or down can and has in the past meant disaster for the yachts. You sure don’t amateurs doing the job .There was no turning back now. It was a one way street to the Pacific. Up we go


DSCN0807-003P5143092P5143114

untitled.png 3

untitled.png 2

Many thanks to Susan and Nick for taking these pictures of us  via the canal webcam. Only one out three cameras were working that day, so we are lucky to have these pics. That blue ship is the SEATRADE that we were behind. The photos are in the 2nd Gatun Lock

Time to chill for a bit. Once we’d cleared the third and final elevating lock on the Atlantic side GWTW was floating 80ft above sea level on Gatun Lake. The umbilical lines joining us to Consensus were dropped and we started our leisurely  motor across twenty eight miles of the scenic freshwater lake gliding past 200 marker buoys as we went.

P5143131P5143143P5143147


P5143171Along this part of the transit is where some very serious excavating and engineering took place, particularly in a skinny section called Culebra Cut. It was here that a channel needed to be gouged out through solid rock to join the man made Gatun Lake to the Pacific Ocean. Considering that this all happened in the early 1900’s using equipment far inferior to what is available today makes the building of the canal even more remarkable. Tens of thousands of workers toiled relentlessly for years. Not all survived due to the prevalent diseases of yellow fever and malaria.


P5143153During our trip across the lake we shared the waters with the biggest of the big ships . The neo-panamax class. These guys are seriously monolithic.They are close to 167 feet  in beam, 1200ft in length and can carry up to14,000 containers. Up until last year ships of this size were excluded from transiting the canal as they were too big for the existing locks. But in June 2016 an additional set of locks were opened allowing these monsters to pass through. The construction of these new locks took nearly a decade and was motivated by Panama wanting to stay competitive in the global movement of shipping. The canal is a vital source of income for the country, who manage it as an extremely profitable business unlike when America was in charge and the canal was run on a non profit basis. It was a darn lot cheaper to transit when the Yanks were in charge.

GWTW’s transit cost around $2,680 US, small beer compared to what the big boys pay which is anything between $300,000 to $800,000. Word has it that China  is looking to build an opposition canal somewhere close by. It may be a myth but knowing the Chinese probably not.

P5143160The trip across the lake was a bit of relaxing downtime for us as we munched  on empanadas and fresh fruit as we went. We tied to a massive ship buoy to have lunch and our Panamanian crew were particularly fond of the big salad which yours truly whipped up accompanied by a spinach, onion and potato frittata. No one was hungry after that. It had been an eat fest since 5am.


Going down, ground floor Pacific Ocean. Once again we rafted to Consensus for the final three lowering locks to the Pacific. Unlike the Gatun locks which are consecutive, the Pacific side locks are not.The linehandlers on the dock throw a monkey first with a line attached which our crew then thread through an eye and the line is pulled up to the dock.The dock guys then walk us into position and tie us off. The same happened in the first three locks as well. They are pretty good shots and although we’d covered our solar panels with airbeds  just to be sure, they always threw the lines towards the trampolines  on the bows.


P5143183P5143184-001

The first two are together with a gap of 1300ft to the last one, the Mira Flores Lock . In this set of locks we were rafted in front of a tanker rather than behind as was the case in the first three locks. It was rather unsettling to have a big beast of a bow so close behind our transom and towering over us, Now we are talking way to close for comfort and most defiantly in our personal space, say 60ft away. Good thing those dock mules had steel cables attached to her to pull her up.

     P5143188 P5143192

The last lock, the Mira Floes Lock is the most famous and this is where the four story Panama Canal visitors centre is located. Hundreds of people visit the centre everyday to see the ships go through  and today was not different. All the tourists were lined up waving and cheering with cameras in hand watching as we descended the final 45ft down to sea level.

DSCN0822DSCN0827DSCN0831


IMG_5283And at 5.08pm on Sunday May 14th 2017 the last lock doors swung open and the mighty Pacific Ocean flowed in  kissing GWTW’s  bows for the first time in 11 years. It was an unbelievably emotional moment for us  and one that we will never ever forget.

Once the doors fully opened our party of two motored out into the fast flowing waters. We let go our lines and said goodbye to our transit buddy Consensus and steered a course to the historic port of Balboa. We dropped off our advisor first and then bid goodbye to Eric.

   P5143226 P5143234


DSCN0851 

As the sun set behind the hills just after 6pm we anchored at La Playita and cracked a chilled bottle of bubbly especially bought for this occasion. John and Frances stayed the night on board and we shared a meal and a couple of vinos before hitting the hay. It had been a bucket list day and we were all pretty beat.

                   


                     It ‘s been a long time coming but we’ve finally done it.

                                  We have transited the Panama Canal!

                                ^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^


Saturday, June 3, 2017

Shelter Bay Marina: Heat, Haulout & Hard work

April 24th – May 14th 2017


DSCN0642As we followed the breakwall into Shelter Bay Marina the feeling on board GWTW was a bit surreal. After many false starts over the last couple of years ,we were finally here. All things going well we’d be transiting the canal sometime in the next few weeks. But before that could happen there was plenty of hard work ahead of us. The “to do “ list was long.


DSCN0645    Having backed into our assigned slip without incident the first priority was to connect up our ships battery charger to shore power so that we could charge our batteries without running engines or generator for hours on end, That sort of behavior is a bit of a no-no in most marinas and it tends to piss of your dock neighbours pretty darn quick, making for really bad karma. As the wet season was on our doorstep the skies aren’t always as sunny  as we’d like and our 760 watts of solar power struggles to feed our power hungry home. With two big freezers and three fridges to support we are power sluts.

On board we have a Zantrax battery charger that is compatible with either 110v or 220v. The problem is that this is the second one that we’ve owned and today Z # 2 has also decided to kark it.In the land of electricity Panama is part of the 110v/60 htz family and that family doesn’t get along with 220v / 50 htz family that GWTW belongs to. In plain language we can’t just whip out the extension cord and plug into the grid down here.  The 110v v system is lethal to 22v appliances that have a motor and we have a quite a few of them on board. The big three being,microwave, oven and washing machine and we sure don’t want to have them out of action.

So what to do. Liam put a call out on the morning radio net and our prayers were answered. Another boat had a spare charger that would work for us and they were happy for us to borrow it for the duration of our stay. We were out of jail and my two chock-a-block freezers rejoiced and my fridges did a happy dance.

Our first three days at the marina were really busy. The Admeasurers, the guys who measure your boat top to toe for the canal transit showed up .With tape measures in hand they went to work doing their thing, Ever since  the USA handed back the running of the canal to Panama back on Dec 31st 1999 the transit fees for all who use the canal has changed . Where as under the eyes of the US there were only flat fees, these days  the fees are of the sliding scale nature. If your vessels weighs in under 50ft the fees are not so bad, but over 50ft  the dollars go up dramatically. Although  we are officially  52ft on paper and sometimes when we use the “other” official papers we shrink  down to 49ft this time there was no way to dodge the length bullet. The tape measure doesn’t lie. This time we were measured at 58.6 ft, that includes our pole at the front.

DSCN0647

The following day, April 26th was our high stress day . It was haulout day. We always cringe on this day ‘cause if things go wrong During the transition from water to land it can become very ugly, very quickly. The marina boasts that they can haul a vessel with a 29ft beam, well we are 27ft and filled the lift out pond with little to spare.

       DSCN0649   DSCN0652

There were quite a few anxious moments as our fenders popped up leaving our hulls just millimeters from the rough concrete sides of the lift pond. All concerned were much relieved once we were airborne and then firmly planted on terra firma. They marina guys power washed us to remove the grime on the hulls taking a lot of the remaining antifoul with it. And just where did all that green paint go? Straight down the drain and into the water! This sure ain’t the USA.


DSCN0656   DSCN0658

The 27th was visa day. As you would remember from the  reading our Jamaica post we were getting all the paperwork sorted to apply for a long stay visa for French Polynesia. Well today we had to hot foot into Panama City to hand over the paperwork in person.

     DSCN0665      DSCN0666


     DSCN0673    DSCN0776

Our interviews, yes one each, were scheduled for 1.30 and 2pm..To get there on time we had to catch the 0745 bus from the marina, then hook in with and express bus , which wasn’t so expressy from  the very dodgy Colon bus terminal to Allbrook bus terminal in Panama  City. Then it was into a cab arriving at the French Embassy with less than an hour to spare. The talkies went well and now we play the waiting  game for around four weeks to see if we got the green light or if we wasted our time and threw away $200 in the process.

DSCN0695Back on the boat the hard yakka started in earnest. With afternoon storms and rain most days our outside work time was severely limited. Add to that the heat and humidity and the tasks of antifouling the bottom, polishing the topsides and even just working inside saw us absolutely pooped at days end. Thank heavens we’d had the sense to pre-book a room in the marinas’ hotel while we were on the hard.  The A/C was wonderful to come home to each night.


DSCN0723As is often the case an X-factor seems to creep in and catch you by surprise while out of the water.

We had ours which meant that our original transit day of May 7th didn’t happen and we were rescheduled for the 14th. A while back Liam noticed a slow leak on one of our propeller shafts. In order to fix the leak he’d have slide the seal collar along the shaft.

But that wasn’t going to happen as one of the grub screws holding the collar in place had seized up resulting in him stripping the head off the screw. His only option was to cut the collar off with a grinder and fit a new one that we had Fed-Exed down from the states. That might sound a pretty easy fix, but cutting through a 20mm piece of solid stainless steel shortened his life buy a day. It was a very trying event, the depth of which only a cruiser would truly understand.

DSCN0745Also while on the hard we made many,many supermarket runs to top up the provisioning as we figured it was way easier to do it via a bus and van than trying to haul in by dinghy once we got to the Pacific side of the canal.

The local Rey supermarket was well stocked but for the bigger bulk items were rented a van and driver who took us to both PriceSmart on Panama City and the Free Zone in Colon.

DSCN0784All those trips were well worth the dollars spent and the convenience of packing stuff back while still in a marina . Albeit we had to get it up a ladder and onto the boat.



   DSCN0680DSCN0712DSCN0713


DSCN0715By now it was Thursday May 11th and time for the re-launch. Going back in the water can be as stressful as coming out and it was. Once the travelift had picked us up and started moving us we noticed GWTW was hanging a bit skewiff in the slings and for a while it looked like we might kiss the concrete on the way back down to the water. But with a lot of muscle power from the boys on the dock they managed to hold us straight ‘till we were floating again.


  DSCN0757DSCN0767


We fuelled up with diesel on the way past the fuel barge after waiting three hours for the barge man to show up. Then it was back to our assigned slip.

With our canal transit now in three days time we had all fingers and toes crossed that nothing untoward would happen between now and then.

                         *********************************************